This has been a busy weekend, as I am getting ready to paint the bathroom and re-grout the tiles, so I needed to make as much progress as possible on getting the second module connected. July is almost history and EVCCON is only 8 weeks away. It seems like there is so much to do and so little time.
The module connections were installed, then the next project was to drill holes in the deck plate for the cables to be run through. There wasn't much room in front of the module but I was finally able to get into a position to center punch the locations and drill the holes with a hole saw.
BATTERY CONNECTIONS INSTALLED
HOLES DRILLED FOR CABLES
Earlier in the day a trip was made to ACE Hardware to pick up some flexible conduit and Liquid Tight Connectors to run the cable in.
3/4in x 25ft Ultratite Flexible Conduit
3/4 IN LIQUID TIGHT CONNECTOR
So the end to a busy weekend, that started with mowing the lawn on Friday, finishing some touch up painting around the new patio door and purchasing a car on EBAY, then working on the battery module. My work cloths still need dried and hung up but tomorrow back to work, so maybe I can get a little break and rest up a little!
Until next time,
Randy
No comments:
Post a Comment